← All news

Ireland: truck tolls rise by around 3.7 % on 1 January 2027

🇮🇪

On 30 October 2026, the Irish road authority Transport Infrastructure Ireland (TII) published the toll rates for 2027. They apply from 1 January 2027 and follow inflation (CPI August 2025 – August 2026: 3.6 %). For trucks, prices rise by around 3.7 % on average. All prices include 23 % VAT.

New truck prices per passage

Toll plaza Truck 2–3 axles Truck 4+ axles
M1 Gormanston, M6 Galway–Ballinasloe, M7/M8 Portlaoise, N8 Rathcormac–Fermoy, N18 Limerick Tunnel, N25 Waterford €5.90 → €6.10 €7.50 → €7.80
M3 (per toll plaza) €3.60 → €3.70 €4.40 → €4.50
M4 Enfield €7.10 → €7.40 €8.80 → €9.10

On the M50 (Dublin, barrier-free), the class depends on unladen weight: goods vehicles over 10 t unladen pay €6.80 with a tag (previously €6.50), vehicles of 2–10 t €5.40 (previously €5.20). Without an account or tag it is more expensive. The Dublin Port Tunnel remains toll-free for trucks over 3.5 t. On the M3, car prices remain unchanged – only trucks pay more.

Examples for an articulated truck (5 axles)

  • Dublin – Cork (M7/M8 Portlaoise + N8 Fermoy): €15.60 instead of €15.00
  • Dublin – Galway (M4 Enfield + M6): €16.90 instead of €16.30

What does this mean for TollCalc?

We took this opportunity to fundamentally revise the Irish model: TollCalc now calculates Ireland per toll plaza using the official fixed prices instead of a per-kilometre average. From 1 January 2027, the new rates apply automatically. Irish haulage associations sharply criticise the increase and are calling for a freeze on truck tolls.

Source: TII – Toll rates from 1st January 2027 · eToll.ie – current toll rates

Latest toll changes

🇫🇷

France: A69 Castres–Toulouse opens – trucks pay up to €30.60

Since 6 November 2026, the A69 motorway between Castres and Toulouse (Verfeil) has been in operation. The operator ATOSCA collects tolls without barriers (free-flow) at four gantries between junction 3 (Verfeil-Est) and 7 (Saint-Palais). Trucks pay by axle class and Euro standard: a class 4 articulated truck with Euro VI pays €27.80 for the entire route (Euro 0–IV: €30.60), a class 3 2-axle truck with Euro VI €19.90. That is around €0.59/km – roughly twice as much as on the rest of the French motorway network. Payment is made with a télépéage box or online within 72 hours. TollCalc applies the official gantry prices from 6 Nov 2026.

Read more →
🇧🇦

Bosnia and Herzegovina: A1 toll around 15 % higher since 1 Nov 2026

JP Autoceste FBiH introduced a new price list for the A1 motorway (Corridor Vc) on 1 November 2026 – the first increase since 2012, around +15 % on average. A truck with 4 or more axles (class IV) now pays 32.00 KM instead of 28.00 KM for Sarajevo sjever–Zenica sjever. Since 4 November the new Zenica sjever–Žepče section (20.3 km) is also tolled, and cash payment is no longer possible at several toll stations. The motorways of Republika Srpska are not affected. TollCalc applies the new rates from 1 Nov 2026.

Read more →
🇪🇸

Spain: AP-68 partly toll-free from 11 November 2026

On 11 November 2026 the Avasa concession on the AP-68 ends. Aragón, La Rioja and the Burgos section become toll-free; Navarra becomes toll-free for cars and light vehicles. Trucks pay new rates in Álava (18/20 ct/km) and get a 20 % discount in Bizkaia. TollCalc has added the new rule version from 11 Nov 2026; the official Navarra truck price is still pending.

Read more →